Adam-Watson-bio-picAdam has 16 years experience as a tradesman, contractor and IOR specializing in school, hospital projects, modernizations and seismic upgrades.

Knowledge and experience with many types of construction delivery agreements from lease/lease back, multi prime, GC and LEAN/IPD programs. Extensive experience working on structural steel, masonry new building projects, green projects and modernization as well as many various types of project delivery and contractual agreements.

Education and Certifications:

  • OSHPD Seminar Los Angeles CA, October 2012
  • DSA seminars San Diego Ca, February 2011
  • Level II NDT, College of Oceaneering San Pedro Ca, December 1998
  • Mayfair High School Lakewood Ca, June 1997
  • Office of Statewide Health Planning and Development (OSHPD) Class A
  • Division of the Sate Architect (DSA) Class 1
  • American Welding Society Certified Welding Inspector (CWI)
  • International Code Council (ICC) Special inspector= Structural Steel Bolting & Welding, Masonry & Fireproofing
  • LA City Deputy Fireproofing Inspector & Non Destructive Testing (NDT) Level II

Projects:
Hawthorne High School. CVUHSD. Budget: 40 million. The scope of work for the Phase 1 project includes demolishing existing buildings that were over 50 years old and reorganizing parking areas, natural landscape area, and underground site utilities. The construction of new buildings includes the Student Services and Counseling Center, Media Center, Science Center, and the School of Engineering.VIEW

El Dorado High School. Budget: 12 million. Project is a 18,000sqft 635 seat theater with cmu masonry, steel construction & light gauge framing. This project emphasized appearance and presentation. VIEW

Yorba Linda High School. Placentia Yorba Linda Unified School District. Budget: 80 million. Project utilized cmu masonry and steel as a primary structural element. Also entailed massive retaining walls, concrete structures and a kitchen/food service area.

Yorba Linda High School. Placentia Yorba Linda Unified School District. Stadium. Budget: 10 million. This is a 4000 seat stadium project which included concrete & prefab bleachers, concrete retaining walls, synthetic track and field and musco sports lighting. VIEW

Yorba Linda High School. Placentia Yorba Linda Unified School District. Pool. Budget: 5 million. Project which included a 600,000 gallon / 9,500 sqft pool and a 4,000 sqft locker/mechanical equipment building.

Valencia High School. Bradford Stadium. Budget: 4 million. Installation of a synthetic field and sports lighting.

Central LA High School #2 A#03-106746, $100 million project which consisted of moment framed/FEMA type seismic connections, concrete grade beam footings, light gauge framing, a pool, theater and the use of intumescent fireproofing.

Central LA High School #9 A#03-107850, $200 million project with steel as the primary structural element and extensive steel architectural features.

Southeast High School #2 A#03-105358, $55 million Construction of (2) 2 story & (2) 3 story moment framed buildings, 1 theater and arts/craft building, gymnasium with locker rooms and playing fields.

  • Skills : DSA Inspection
  • DSA Inspector Class 1