bousdBrea Olinda High School, Brea Olinda Unified School District. Budget: 10.5 million. Construction of a two story 20,000 sq.ft concrete tilt up science classroom building and alteration of one existing science classroom, with site improvements. The new building had sandblasted colored concrete tilt-up panels with structural steel framework interior, metal stud walls and elevator. Site work included: soil grouting and stabilization, site drainage, masonry retaining walls, 2-concrete bridges, exterior stairwells, ADA ramp, and a new asphalt paved parking lot.

  • Skills : BOUSD, DSA Inspection
  • Daniel Alberico, DSA Inspector Class 1