CurtisParker-profile-picCurtis has 15 years of experience as a tradesman and 10 years as a DSA project inspector on school projects. Excellent coordination skills between District officials, Architects, Engineers and DSA field engineers. Experience with new buildings, modernizations, new stadiums and all aspects of construction. Assist school districts with scheduling, problem solving and monitoring of all projects.

 

 

Projects:
Anaheim Union High School District. Multiple construction projects through out the District: Katella HS Shade Structure (1) 20′ X 20′ Shade Structure, Trident Shade Structure (2) 30′ X 30′ Shade Structures. Other projects included: Painting, Landscape, Hardscape, Drainage and HVAC. VIEW

Magnolia High School, Anaheim Union High School District. Project StormTech SC-740 Chamber 50ft. X 200ft. X 12ft. deep excavation system for subsurface stormwater management including a layer Geotextile fabric, a layer of 2″ rock, installation of chambers, another layer of 2″ rock and enveloped in another layer of Geotextile fabric. Completely covered and compacted in soil. (2) catch basins tied into each end and tied into the storm drain of the school site. VIEW

San Juan Hills High School, Capistrano Unified School District. Construction of Stadium Home Bleachers and (1) Concession Bldg. (2) Toilet Bldgs. Outdoor Bleachers & Press Box, Vertical & Incline elevators, Track & Field and site-work. VIEW

Placentia Yorba Linda Unified School District. (3) projects: Kaemer Middle School Modernization: Moderation of (2) Buildings, parking lot & construction of (2) Screen Walls. Bradford Stadium: Parking Improvements (Accessibility), Construction of Home & Visitor Bleachers, Press Box & elevator. Valencia High School: Installation of (9) Portable Buildings on new footings.

Anaheim Union High School District Multiple projects: Anaheim High School,
Construction of (2) Building and site-work. Lexington Jr. High School. Cypress Door Hardware replacement. Orange Coast College. Construction of (3) Substation buildings, Alteration to: Parking Lot and installation of new underground Utilities.

El Camino Real Elementary School, Irvine Unified School District. (Woodberry) Construction of (1) New Building, (1) Administration building, Shade Structures and site work.

  • Skills : DSA Inspection
  • DSA Inspector Class 3