EdL-profile-picEd has been a general building contractor since 1995 specializing in seismic retrofit and Construction of new public storage buildings. DSA inspector since 1999 OSHA 8 and 24hr approved.

 

 

 

 

Education and Certifications:

  • Class 2 Cert. # 3874 DSA Building Inspector
  • Calif. B-1 General contractor Lic. # 732819
  • 8 and 24hr OSHA Certified
  • W/$2 million Errors and Omission insurance coverage.
  • Also performs Ground rod testing
  • Equipment mounting nut and bolt Torque testing.

Projects:
Live Oak Elementary School, North Lake Hills Elementary School, Castaic Elementary School, Castaic Unified School District. Budget: $3 million for 3 schools. Installation of new Solar Panel systems. VIEW

Eastside Elementary School #5. Constructed two steel framed buildings, placed eight permanent modular buildings, placed ten relocatable buildings, and site work.VIEW

Santa Monica / Malibu Unified School District. Budget: $3.3 million for 9 schools. Project Inspector of record for installation on new Solar Panel systems at the following schools:
Grant Elementary School. Budget: 256,956
McKinley Elementary School. Budget: 67,620
Webster Elementary School. Budget: 196,098
Pt. Dume Elementary School. Budget: 189,336
John Muir Elementary School. Budget: 42,250

Norton Elementary School, San Bernardino Unified School District. Budget: 8,102,000. Assistant inspector for new construction on Elementary school including UG utilities, concrete foundation, steel erection and wood framing as well as electrical, plumbing site work and fire alarm system as well as ADA compliance.

Montebello Unified School District, Applied Technology Center. Budget: 29,000,000 W/ change orders. Worked as an assistant inspector on new High School including UG utilities, concrete foundation, steel erection, metal framing, electrical ,plumbing, fire alarm, site work and ADA compliance.

Los Angeles Unified School District. Project inspector of record for installation of New Fire alarm systems at the following schools:
Brainard Elementary School. Budget: 325,800.
Broadous Elementary School. Budget: 449,000.
Dyer Elementary School. Budget: 773,661.00.
Fenton Elementary School. Budget: 498,000.
Herrick Elementary School. Budget: 327,690.
Lankershiem Elementary School. Budget: 386,900.
Olive Vista Elementary School. Budget: 1,275.000.
Pacoima Elementary School. Budget: 556,351.00.
Plainview Elementary School. Budget: 312,000.
Saticoy Elementary School. Budget: 539,599.00.
Sylmar Elementary School. Budget: 526,000.

Verdugo Hills High School. Budget: 948,000. Grandstand renovation, installation of handicap ramps at school, construction of new restroom building, new girls softball field, new grandstand seating area with assisted listening devices, 5 new ADA ramps at grandstand, upgrade parking lot to ADA standards, new paving, new way finding signage, new doors to admin bldg.

VHHS Flex. Budget: 265,000., Modernization of Science classroom and 3 restrooms.

Sylmar High School. Budget: 47,000 Non DSA Modernization of cafeteria kitchen and serving area.

Los Angeles Community College District.

Los Angeles Harbor College $4.9 million interior remodel of fine arts, drama, music & nursing building, new Electrical, Plumbing, Painting , etc. $2.5 million to build new football/track stadium with artificial turf, restrooms, new parking lots and bleachers.

Los Angeles Trade Tech College $800,000. to remove existing oil tanks and build new parking lots and bleachers.

Los Angeles Southwest College $5.8 million for installation of new underground electrical for football/track stadium field house, M&O building, student services center and child development center. $6.2 million to complete new extension and modernization at the north east quad including cox building, tech ed., student services and child development center. Note: This was a design build DSA project

  • Skills : DSA Inspection
  • DSA Inspector Class 2