EdY-ProfileEd has 24 years of experience as a DSA inspector in all disciplines of construction. He is a trained Electrician, specializing in Low Voltage and Controls IE: Nurse Call systems, Fire Alarm, Computer Controlled equipment, and qualified to install medium and High Voltage work.

 

 

 

Education and Certifications:

  • DSA Inspector Class 1 Cert. #1665/ 5000
  • DSA Pneumatically placed Concrete Cert. # 2405
  • Riverside Community College
  • Various Code and electrical courses through DSA and ICBO every year

Projects:
Enchanted Hills Elementary School, Perris Elementary School District. Budget 125K. Kitchen remodel with a new walk-in Freezer addition to the building. VIEW

San Bernardino City USD- Group 7 Remodel Project
Remodel 4 Schools with 5 Projects for new ADA Pathways, Fire Alarm, Finishes, Concrete and Wood Framed Construction. 5 Million.

Antelope Valley Community College- Central Plant Project. 2 New Central Plant Building with Campus Wide chiller System. 7 Million.

Chino USD – Don Lugo High School Stadium Project. New Construction of Stadium and snack Bar and Team Rooms. 7.4 million cost. Steel, Concrete, Masonry & Wood Framed Construction.

Antelope Valley Community College- West Campus expansion. New Construction of Stadium and Sport Fields 34.4 million Cost. Steel, Concrete, Masonry and Moment frame construction.

Antelope Valley Community College-Agricultural Lab Bldg. New Construction , Steel Moment frame, Storefront. 4.5 Million.

Placentia/Yorba-Linda Unif. – Various Projects 50.7 million cost. New Construction. Tilt-up, Steel Moment frame, Masonry.

Placentia/Yorba-Linda Unif. – Lakeview Elementary. New Construction. Wood /Steel Frame, Sheer wall construction. Masonry. IOR

Placentia/Yorba-Linda Unif. – Melrose Elem. New Construction. Two Story Elementary school. Steel Moment frame, Steel Framing. Masonry. IOR with 2 assistants

Placentia/Yorba-Linda Unif. – District Warehouse Project. New Construction. Tilt Up Building. Steel Truss Roof. Metal and Wood stud Framing. IOR

Cerritos College – Liberal Arts Bldg and Social Science Bldg Seismic Upgrade New Construction and Remodel. Masonry and Steel Bldgs and Braces for seismic reinforcement of two Bldgs. Caissons to 70 Ft. Depth. Shotcrete IOR ($ 6.9 M)

LACCD Pierce College – Student Services Bldg. New Construction of Masonry and Steel Bldg. Truss Joist Roof. Inspector of record. ($7.6 M Cost)

Alvord Unified SD-Norte Vista High School and Mcauliffe Elementary. Remodel plus Stadium. All types of construction used. Inspector of Record. (16.7 M Cost)

Citrus College-Various Projects 51.7 million cost. Addition and Remodel of Cosmetology Bldg. IOR. Wood Framing / Sheer wall and Storefront Construction.

Citrus College-Adaptive P.E. Bldg. New construction. Handicapped Physical Therapy Building. Masonry Building with steel deck and insulcrete roof. IOR.

Citrus College-Physical Science Project. Remodel of building Labs and Structural upgrade of roof. IOR

Citrus College-Recording Arts Project. Video and Audio Recording Technology buildings. New Multi story Steel moment frame building with Masonry veneer. Isolated Multi layer Masonry Recording Studio with isolated slabs. IOR for project. New Construction

Citrus College-ADA Barrier Removal Project. New Building of Theater Admin/Ticket booth and remodel of campus building entrances and elevators to meet ADA regulations. Installation of two new elevators. IOR

Citrus College-Stadium Renovation: new mondo track and Football field. New bleachers, new scoreboard , sound system and electrical services. Misc new buildings. IOR

Citrus College-Golf Driving Range. New Golf driving range and pro shop at citrus. IOR for project.

Citrus College-Utilities Project. New 15Kv Main station and 10 sub stations through-out campus. Entailed installation of all power conduits with a campus wide communication conduits in full encasement with a campus wide addressable fire alarm system. Masonry Construction. Inspector of record.

Citrus College-Biology/Life Science Remodel. Remodel of Life Science Building consisting of acid resistant waste piping, underground fume evacuation system, Backup generator system, High voltage sub-station, and general construction. Inspector on Project.

Pomona Unified School District-Arroyo Elementary School Remodel. Electrical, Mechanical, and Architectural Remodel of entire school. IOR (1.6M cost)

Electrical department- Sites State Wide Supervised Installation of Power, fire, data and communication systems for Temporary schools and classrooms. Supervised 14 permanent and up to 35 (Union Hall) Electricians.

Standard Electric Time Corporation-Service Manager. School Sites State Wide installation of fire alarm, data, communication, and clock systems.

Electrician Foreman with crew of 50+ Electricians. Wireman, specializing in controls, data, Fire Alarm and communication systems. Projects: Communication system at Balboa Hospital- San Diego
Manufacturing control systems at Cieba Giege Chemical Plant.
Refrigeration Controls at Alta Dena Dairy. (360,000 Sq. Ft Freezer)

  • Skills : DSA Inspection
  • DSA Inspector Class 1