Glen-profile-picGlen has a strong field background with over 35 years experience in project inspection, supervision, and management for a variety of projects ranging in value from $ 0.5- to 20-million, including schools, hospitals, medical offices, commercial development, residential, and public works projects. He has experience with design/build, hard bid, and cost plus contracts with owners. Inspection of DSA Class 1 projects including modernizations (with seismic retrofits) and new construction from the ground up.

Extensive experience on projects in school construction (DSA), medical (OSHPD), public works, and in the private sector. Experience as a superintendent and onsite project manager with a full staff and substantial in-house labor forces. Proficient in all aspects of construction management with full accountability for project profit margin.

Education and Certifications:

  • University of Texas – Major in Structural Engineering.
  • College of the Mainland, Texas. Associate of Arts.
  • University of Texas – Major in Structural Engineering.
  • Certified DSA Class 1 Project Inspector
  • ACI Certified Concrete Field Testing Technician – Grade 1
  • Certification for Concrete Batch Plant Inspection
  • NICET erosion and sediment control Level I

Projects:
Jefferson Elementary School, Lennox School District, Budget: $18 Million. Project addition #2, new class room buildings – 2 two story structural steel buildings and 2 single story wood structures. The project totals 45,000 sf, plus associated site work. VIEW

Eastside Union School District. Budget: $5,400,000. Projects Modular buildings and associated site work. The two projects were built simultaneously.

Los Olivos Elementary School, Los Olivos School. Budget: $2,000,000. Campus Improvements and New Classroom Building – Type 1, wood structure.

Brandon Elementary School, Goleta Union School District. Budget: $2,000,000. New Multipurpose building – Type 1, wood structure.

San Marcos High School, Santa Barbara School District. Budget: $10,000,000. Swimming Pool and Gymnasium Renovation – Phase 1 & 2. Campus Modernization, Budget: $1,700,000, Relocatable Classroom and Restroom Buildings, Budget: $480,000.

California High School, Whittier Unified High School District. Class room modernizations, Gymnasium remodel, and construction of new masonry concession building and associated site work.

Ana Verde K-8, Palmdale, CA. $22-million Contract Amount – Five buildings totaling 90,000-SF. Type 1, structural steel, moment frame construction. These were multi-storied structures, which included administration areas, multipurpose building / gymnasium, and classrooms. 17 acres onsite improvements including grading, utilities, site concrete, asphalt pavement and landscaping. Offsite infrastructure improvements for the City of Palmdale including storm drain, sewer mains and roadway.

Wal-Mart Site Infrastructure, Palmdale, CA. $7-million Contract Amount – 33 acres onsite improvements including grading, utilities, site concrete, asphalt pavement and landscaping. Extensive infrastructure improvements for the City of Palmdale including storm drain and sewer mains and roadway. CalTrans State Highway 138 construction and improvements.

Chrysler Jeep Dealership, Las Vegas, NV. $5.2-million Contact Amount – 48,000-SF, Type 1, 2-story, structural steel, moment frame construction. The contract included extensive offsite utilities and street improvements within both the City of Las Vegas and Clarke County.

Enron Corporation, Fiber Optic Regeneration Stations. $8.8-million Contact Amount – I was in charge of twelve 2,500-SF, 1-story, masonry block structures that stretched from Dallas to Houston, Texas.

Consumer Pipe and Supply, Las Vegas, NV. $1.2-million Contact Amount – 15,000-SF, 1-story, concrete tilt-up structure

Colorado Mountain College Residence Hall, Glenwood Springs, CO. $4.5-million Contact Amount – 48,000-SF, 3-story, concrete / Greenblock structure

Designed and built custom homes and performed seismic retrofits and insurance related work due to earthquake damage. Developed and implemented accounting and management systems within the company and was responsible for all project management including staff supervision.

Price Club site improvements, Montebello, CA.. $1.5-million – cribwall, parking structure and grading.

Rita Avenue parking structure, Huntington Park, CA. $2.5-million – 100,000 SF concrete structure

Highland-Camrose Park, Hollywood, CA. $1.5-million – County of Los Angeles Park

Yorba Linda Presbyterian Church, Yorba Linda, CA. $1-million – church.
Human Services Association, Bell Gardens, CA. $1-million – offices and multi-use space.
Inter-Community Medical Center, Covina, CA. $3-million – phased remodel in operational hospital which included new Neo-natal ICU and Oncology Units.

The company was a design / build firm that was involved in land development, design, construction and property management.

  • Lancer Landing, Newport Beach, CA. $4.8-million – commercial/office space, over subterranean parking on Newport Bay.
  • Vinci Plaza, West Los Ángeles, CA. $3.2-million – commercial/office over subterranean parking
  • Villa Scalabrini Retirement Center, Sun Valley, CA. $2.0-million – intermediate care geriatric facility
  • Westlake Medical Office Building, Westlake Village, CA. $4.2-million – 2 story medical office building with tenant build-outs
  • Alvarado Medical Facility, San Diego, CA. $4.0-million – 3 story medical office building

Completed the first of a group of prototypical psychiatric hospitals for Charter Medical Group. All of the hospitals were structural steel with moment frame construction.

  • Days Inn Hotel, Riverside, CA. $8-million – 8-story hotel.
  • Manor Care Nursing Facility, Hemet, CA. $3.4-million – nursing facility.
  • Charter Grove Psychiatric Hospital, Corona, CA. $6.5-million – psychiatric hospital.
  • Charter Baywood, Long Beach, CA. $4.5-million psychiatric hospital.
  • Charter Sunrise, Albuquerque, NM. $4.5-million – psychiatric hospital.

Albuquerque V.A. Medical Center, Albuquerque, NM. Contract amount $52-million
Conoco Wood Creek Park Office Building, Houston, TX. Contract amount $120-million
University of Texas Medical Branch Ambulatory Care Center, Galveston, TX. Contract amount $30-million
University of Texas Medical Branch Arts Learning Center, Galveston, TX. Contract amount $18-million

  • Skills : DSA Inspection
  • DSA Inspector Class 1