JackBDunne-bio-picJack has more than thirty five years experience in the construction industry with more than twelve years as a DSA Inspector specializing in wood frame, concrete, masonry and steel building projects, Construction experience includes primarily schools, commercial, institutional and residential construction. Excellent social skills, communication and computer skills. Complete knowledge of DSA procedures for closing out a project.

 

Education and Certifications:

  • DSA Project Inspector, Class 1
  • DSA Structural Masonry Inspector
  • ICC Structural Masonry Inspector
  • ICC Reinforced Concrete Inspector
  • ICC Structural Welding S2
  • ICC Structural Steel and Bolting S1
  • ACI Concrete Field Testing Technician Grade I
  • Contractor’s License, Masonry C29 and Concrete C8
  • Member, International Code Council (ICC)
  • Member, American Welding Society (AWS)

Projects:
Mount Miguel High School, Grossmont Union High School District. Budget: $5 million. Project is a fully gutted modernization. The existing building is a 20,000+ square foot classroom building. The remodel consists of new music classrooms, new choral room, new black box theater, and a new commercial kitchen. There will be several offices and storage rooms as well as two new student restrooms. Scheduled to end on March 2, 2014. VIEW

The Ridgemoor Elementary School, Menifee Union School District. Modernization project consisted of remodeling three classroom buildings. There was a total of 18 classrooms which were converted into 12 new classrooms. The existing classrooms were originally constructed smaller than California standards. The project also included new finishes inside the three classroom buildings, a new site wide fire alarm system, and several accessibility upgrades. This project was scheduled during summer break and was completed on time and without any open punch list. This project has been DSA certified. VIEW

Oswalt Academy – Rowland USD. Budget: $4,200,000.00. New Science Classroom Building, City of Walnut, Rowland USD. Project consisted of a New Classroom Building with nine regular classrooms and one large science classroom. This new building turned out very beautiful and got the attention of the School Board Members as well as the Walnut City Counsel who all attended the opening ceremonies with the local newspaper photographers. Project was delivered on time and without a punch list. VIEW

Hawthorne High School, Centinela Valley Union High School District. Interim Housing. The scope of work for the Phase 1 project includes demolishing existing buildings that were over 50 years old and reorganizing parking areas, natural landscape area, and underground site utilities. The construction of new buildings includes the Student Services and Counseling Center, Media Center, Science Center, and the School of Engineering. VIEW

Lawndale High School – Interim Housing. Student Services Center consists of approx. 125,000 sf spread over 3 stories housing administrative, student services, classroom spaces and the campus Library. There will be 42 Teaching stations encompassing, standard classrooms, Labs and Elective courses. The construction is Type IIA fully sprinklered. VIEW

Los Angeles Unified School District
Chaffey College
Lake Elsinore Unified School District
Fallbrook Unified School District
Palm Springs Unified School District
Murrieta Unified School District
Saddleback Valley Unified School District
San Diego Unified School District

  • Skills : DSA Inspection
  • DSA Inspector Class 1