KevinJ-profile-picKevin, US Veteran prior to 28 yrs in the Construction Industry as a Framer, Field Superintendent and Framing Contractor. 8 + yrs as a DSA Inspector for LAUSD, SMMUSD and CVUHSD.

 

 

 

 

Education and Certifications

  • DSA Class 1 Project Inspector, #5685
  • ICC/ICBO Building Inspector, #0303810
  • CSLB-B1/C39, #493489
  • CAL EMA DSW Coordinator
  • ACI-#01058245
  • Cal OSHA 10 Hr
  • Member, American Legion

Projects:
Lawndale High School, Centinela Valley Union High School District. Budget: 36,000,000. Project includes: New Student Services Building, 1-New 115,000 sq ft 3 Story Academic building, 1-New Electrical Enclosure and Site work. 4 -Chemistry Labs, 8 -Life Science & Biology Labs, 4 -Computer Labs, 24- Standard Classrooms, Media Center & Library, Health & Career & Student Services VIEW

McKinley ES, Santa Monica/Malibu Unified School District. Budget: 2,300,000 (one of two). Main Office reconfiguration and boys & girls Rst Rm ADA upgrade.

Malibu High School/Middle School, Santa Monica/Malibu Unified School District. Budget: 2,300,000 (two of two). Campus wide Fire Alarm upgrade.

South Region Elementary School # 6, Los Angeles Unified School District. Budget: 34,985,429.00. Project included: 2 story CIP Concrete Bld with 32 Classrooms, Administration Wing and Library on a concrete parking structure, 86,000 sq ft. 1- Multi-Purpose Bld with Kitchen and Dining is SOG, CMU Walls, with Steel Brace fames and steel stud framing/shear walls as the primary lateral load-resisting system, 9,860 sq ft. 1-Kindergarten Bld with 6 classrooms, with Steel Brace fames and steel stud framing/shear walls as the primary lateral load-resisting system, 8,400 sq ft.

Valley Regional High School #6, Los Angeles Unified School District. Budget: 72,975,000.00. Project included:
3 Buildings with a combined total of 129,531 sq ft, 1-3 story Existing Concrete Parking struc w/a Major Seismic Retrofit. 1-3 Story Existing Structural Steel Frame Bld. w/ a Major addition and Seismic Retrofit to the Existing Bld. Containing classrooms, Science Labs and Central Administration. 1-2-story CMU Bld. With Structural Steel Moment Frames/ Steel Roof trusses for Performing Arts, Library, Academy Administration and Cafeteria. 1-2-Story CMU Bld. with Structural Steel Moment Frames /Steel Roof trusses for Gymnasium, Locker Rms, Dance and Weight Rm.

Valley Regional Elementary School #7, Los Angeles Unified School District. Budget: 34,985,429.00. Project included: 2 story Structural Steel bld. with 32 classrooms, Administration wing and Library on a concrete parking structure. 1-MPR bld. with Kitchen and Dining is Slab on Grade with Brace fame and steel stud framing/shear walls as the primary lateral load-resisting system. 88,880 sq. ft.

Roy Romer Middle School, Los Angeles Unified School District. Budget: 44,486,913.00. Project included: Seven Buildings with a combined total of 150,000 sq. ft. 3 -Class room buildings; Three story Class room blds with CMU walls as the primary lateral load-resisting system with cast in place concrete decks and roofs with Structural steel bridges and canopies. 1-MPR building; two-story structural steel building with CMU walls, structural steel floor and roof trusses with light weight concrete decks and roof with Structural steel bridges. 1-Library; two-story CMU building with structural steel floor and roof beams with wood floor / roof construction. 1-Gymnasium; structural steel building with CMU walls, with wood frame boys and girls rest rooms. 1-Locker room building; 1 story wood frame building containing boys/girls locker rms/showers and coaching staff.

Los Angeles Unified School District. ADA / Modernization Program 1987-1991*
Breed st. Elementary School
Gridley Elementary School
Gridge Elementary School
Bridge St. Elementary School
Menlo Elementary School
18 St. Elementary School
Broadway Elementary School
San Pedro Elementary School
28 St. Elementary School
Glassell Park Elementary School
San Fernando JH & SH

  • Skills : DSA Inspection
  • DSA Inspector Class 1