MarkP-bio-picMark Palmer has Provided Class 1 Project Inspection, OSHPD Level “A” Inspection, Municipal Senior Building Inspection, Contractor Quality Control, MEP BIM Coordination, Constructability Review and Code Analysis services since 1986. Special Inspector of Post Tension Parking Structures and Structural Steel Moment Frame and Eccentric Braced Frames, Type 1 Construction, of E, B and I Occupancies beginning in 1982.

 

Education and Certifications:

  • Office of Statewide Planning & Development, Level A. No. 10550
  • I.C.B.O Building Inspector No. 46355
  • I.C.B.O Structural Steel Welding and Bolting No. 32698
  • Certified Medical Gas Inspector, Piping Industry Progress and Education Examination Board
  • Level 1 Ultrasonic technician
  • A.W.S C.W.I Welding Inspector
  • Special Inspector for Concrete, Pre-stressed Concrete and Structural Masonry
  • Riverside Comm. Coll.
  • Chaffey College
  • Orange Coast Comm. College
  • Ft. Sam Houston AIT 91B Medic School
  • Randolph Macon College Ashland VA.
    •  
      Projects:
      Vermont Elementary School. San Bernadino City Unified School District – Two-Story Classroom Building.

      Trabuco Hills High School – Modernization.

      San Bernardino Valley College, Central Plant Application. Construction of 1- New 1,000,000 gallon Thermal Energy Storage Tank, 1-Central Plant – Alterations to 10-Bldgs.

      El Dorado High School
      Valencia High School
      El Camino High School Application No. 04 -111443
      El Dorado High School Performing Arts Center Application No. 04-111491
      Valencia HS Interim Housing Application No. 04 -112535
      Yorba Linda HS Interim Housing Application No. 04 -112519
      Yorba Linda HS Musco Lighting Application-04 -111826

      South Region Elementary School No. 10 A-03-112554
      Project Scope: $30,627,850.million Construction of 1-Admin/C.R. Building, 1-Classroom Building, 1-Multi-purpose/Food Service Building.

      South Region High School No. 12 A-03-111424
      Project Scope: $70,973,724.00 Million Construction Of Admin Bldg; C.r. Bldg; Gymnasium/mp/underground Parking Bldg; Food Service/m&o Bldg; Pool Bldg; Outdoor Pool; Lunch Shelter; Service Yard Enclosure; Athletic Field & Tennis Courts; Site Walls; Site Work.

      Central Region Elementary School No. 16 A-03-109820
      Project Scope: $ 40 million 3 Story Str. Steel Moment Frame – Type 2 FR with CIP Underground Parking and a Type 1, A / B Occupancy Multi – Purpose Building for LAUSD in Los Angeles CA.

      St. Joseph’s Hospital Cancer Center
      Project Scope: $ 100 million dollar Cancer Center, 7 Story Medical Office Building and 7 Story Pre-stressed Parking Structure located in Orange, CA.

      California State University Performing Arts Facility:
      Project Scope: $ 40 million dollar, 108,389 Sq.Ft. Structural Steel and Structural Masonry Type 1, with Musical Performance, Ballet and Acting Theatres, Fullerton, CA.

      West Valley Detention Center
      Project Scope: $ 220 million dollar, $ 740,520 Sq. Ft. Structural Steel and Structural Masonry Type 1, I3 Occupancy I3, 2500 Bed Facility, Rancho Cucamonga, CA.

      Newport Harbor High School Interim Housing, a – 04 – 105213: $2.5 million project, Newport Beach, CA.
      Newport Harbor High School Pool Renovation, a – 04 – 104932: $1.2 million project, Newport Bch, CA.
      College Park Elementary School, a – 04 – 105213: $2.5 million project, Costa Mesa, CA.
      Junipero Serra High School, a – 04 – 104217: $7.5 million project, San Diego, CA.
      Jean Farb Middle School, a – 04 – 104199: $5 million project, San Diego, CA.
      DePortola Middle School, A – 04 -104161: $ 4 million project, San Diego, CA.
      Nichols Elementary School, a – 04 – 100678: $15 million project, Oceanside, CA.
      Perris Union High School, a – 51499: $60 million dollar High School project, Perris, CA.
      Vista Verde Middle School, a – 54618: $18 million dollar Middle School project, Moreno Valley, CA.
      Thomas Rivera Middle School, a – 54710: $18 million dollar Middle School project, Moreno Valley, CA.
      Rainbow Ridge Elementary School, A – 49330: $ 14 million dollar structural masonry and structural steel, Moreno Valley, CA.
      Wilson High School Reconstruction, A – 60674: $ 22 million dollar reconstruction with new finishes, MEP systems and two structural steel towers with elevators for handicap access, Long Beach, CA.
      Victor Valley College Campus Center, a – 47330: $5 million dollar, structural masonry and structural steel project spanning a lake, Victorville, CA.

      MTA Inspector

      Metro Rail Structures Inspector for Ralph M. Parsons: $ 5 Billion Project, Inspection of Structural Tunnel Segments on North Hollywood Segment Three, North Hollywood, CA.

      Construction Manager / Inspector of Record

      California State University System / New Park Housing: Facility damaged during Northridge earthquake: $25 million reconstruction of 15, 3 and 4 story, Type V buildings with over 1000, 1, 2 and 3 bedroom units and first floor administrative offices, Northridge, CA.

      Inspector of Record (OSHPD)

      Memorial Care Ambulatory Surgical Center: Laguna Hills, CA.
      Hospital Replacement Project, I.L. – 021562-19A: $ 130 million dollar, 185 Bed Acute Care Trauma Center, Panorama City, CA.
      West Valley Detention Center: $ 220 million dollar, Type I3, 2500 Bed Facility, Rancho Cucamonga, CA.
      Hemicinto Convalescent Hospital, OSHPD SNF: $ 23 million dollar, 125 Bed, Skilled Nursing Facility, Hemet, CA.
      C.P.C. Alhambra Hospital, H.L. – 900001 – 19: Gymnasium, Classroom and Pharmacy Addition, Alhambra, CA.

  • Skills : DSA Inspection
  • DSA Inspector Class 1