ScottB-profile-picScott has 30 years of structural design, construction, welding technologies, fireproofing inspection, consulting and quality control management, including 25 years of building code enforcement has created the ability to implement skills and expertise to produce rapid, effective and owner profitable results from the start through finish of project. His professional skills are in Quality Control, Construction Management, Structural Detailing, Steel Fabrication and Erection Inspection, Concrete, Fireproofing, Masonry Inspection and Projects Consulting including plan review related to DSA and OSHPD projects including; mid range, high rise and wood construction.

Education and Certifications:

  • State of California – DSA Class 1, #1449
  • College, general business and engineering.
  • Served U.S. Army, Honorable Discharge

Projects:

Crafton Hills College, Occupational Education Building, San Bernardino City USD. Budget: 16,700,000.
The (N) OE2 Building consists of (2) separate wings connected by a linear spanning building element. The Building will be Type II (B) Construction wi an A Group A-3 Occupancy Classification (fully
sprinklered).

The structural system will consist of a”concrete foundation system with a steel frame structure reinforced with buckling restrained brace frames (BRBF’s).

The primary program functions include Fire Academy Classrooms & Offices wi adjacent fire truck vehicular storage. General Classrooms and Meeting Rooms will be located on the linear spanning building element on Level 2. Respiratory Care I EMS Classrooms and Offices will be located in the westerly wing on Level.

The exterior envelope of the (N) OE2 Building consists of CMU veneer, insulated metal wall panels, vertical aluminum plate clad “fins”, integral exterior cement plaster and storefrontlcurtain wall window systems. Roofing systems shall consist of adhered membrane at the Roof Level, non-adhered membrane wi stone ballast and precast concrete pedestal pavers over a liquid applied water barrier at Level 2. VIEW

Roosevelt Elementary School, Henry Elementary School, San Bernardino City Unified School District. Budget: 14,178,476.00. Project Type V 1 & 2 hour rated/ fully sprinkled. Wood Framed/Steel Framed (7) Buildings, (1) Administration, (1) Library, (1) Multi-Purpose, (1) Kitchen, (3) Classroom Buildings.

South Region High School # 2, Los Angeles Unified School District. Budget: 95,000,000.00. Project Type II 1-3 hour rated/fully sprinkled on 22 acres, New Construction High School, HVAC Central Plant with Cooling Towers, Cafeteria, Library, Soccer, Softball, Football Fields with
synthetic surfaces. (3) Three Story Steel Frames, Classroom Buildings. (2) Three Story Steel Frame Administration, Classrooms, and Music Studios. (2) Masonry Buildings, Multi-Purpose Use, Stage, Gymnasium and Practice Dance Studios. Synthetic playfields.

Elementary School #14, Lake Elsinore Unified School District. Budget: 12,000,000.00, Project Type V 1 hour rated/fully sprinkled on 17 acres. Granite Mountain Removal for New Construction, (3) Single Story Wood Framed Buildings, Multi-Purpose, Classrooms, Administration, Library, Adjoining Corridors for Computer Stations. Kindergarten Classroom Building. (1)Masonry Utility Building.

Middle School #5, Lake Elsinore Unified School District. Budget: 26,750,000.00 on 25 acres. Project Type V 1-2 hour rated/fully sprinkled. Import 170,000 yards structural fill for project. Try level build up of site flood zone, located south of Lake Elsinore. Construction of (1) Masonry Building for Gymnasium, and Music/Dance Studios. (1) Wood Framed Multi-Purpose, Administration, Library, Kitchen Facility. (6) Wood Frame Classroom Buildings. Soccerl Football and Softball Fields.

San Jacinto Elementary School, San Jacinto Unified School District. Budget: 10,036,378.00 on 17 acres. Project Type V 1 hour rated/fully sprinkled. Construction of Single Story Wood Frame Buildings. Administration, Classrooms and Library. (1) Masonry utility Building with Play-fields.

City – County Library, Performing Arts Building, San Jacinto Unified School District. Budget: 5,442,000.00. Type II and Type V 1-2 hour rated/fully sprinkled 2 acres. Construction of City, County, S.J.U.S.D. Library with Adjoining S.J.U.S.D. Performing Arts Building. Corridor/Foyer Building Separation. Single Story Wood Frame Library with Rotund Ceiling connected through Corridor/ Foyer to a Two Story Steel Frame Performing Arts Building.

  • Skills : DSA Inspection
  • DSA Inspector Class 1