ScottC-profile-picScott has 21 years of construction experience. He has worked as a contractor, project supervisor and sole owner and operator of his own construction business. He is well versed in interpreting plans and specs.

 

 

 

 

Education and Certifications

  • DSA Inspector of Record – Class 2
  • C6 Contractors License #879932

Projects:
Oak Middle School, Los Alamitos Unified School District. Budget: 20,00,000. This project was a complete modernization of the school including all underground utilities: trench/backfill, gas, telecommunication, power, sewer, and storm drain lines. Fire alarm system including; strobe/horn, pull downs, heat/smoke detectors, dampers, beam and beam reflectors, and riser/bell.

Los Alamitos High School, Los Alamitos Unified School District. Budget: 7,336,000. Complete modernization of the gym and main locker rooms for the high school. We removed everything except the outside walls of each building. Underground utilities included: trench/backfill, gas, telecommunication, power, sewer, and storm drain lines. Fire alarm system including; strobe/horn, pull downs, heat/smoke detectors, dampers, beam and beam reflectors, and riser/bell.

Hopkinson Elementary School, Los Alamitos Unified School District. Budget: 9,700,000. Complete modernization of the gym and main locker rooms for the high school. We removed everything except the outside walls of each building. Underground utilities included: trench/backfill, gas, telecommunication, power, sewer, and storm drain lines. Fire alarm system including; strobe/horn, pull downs, heat/smoke detectors, dampers, beam and beam reflectors, and riser/bell.

McAuliffe Middle School, Los Alamitos Unified School District. Budget: 15,500,00. Projects modernization including underground utilities: trench/backfill, gas, telecommunication, power, sewer, and storm drain
lines. Boiler, cooling tower, and heat pumps. Fire alarm system including; strobe/horn, pull downs, heat/smoke detectors, dampers, beam and beam reflectors, and riser/bell.

Anaheim High School – Regional Occupational Program “Dental”, Anaheim Union High School District. Budget: 530,000. Projects modernization including underground utilities: trench/backfill, power, sewer, and storm drain lines. Fire alarm system including; strobe/horn, pull downs, heat/smoke detectors, dampers, beam and beam reflectors, and riser/bell. High school ROP modification from HVAC, Tbars ceiling, insulation, sheer wall, patch concrete work, decking, lath/plaster, wood framing, cabinets, and painting. Dental plumbing including: dental air lines, vacuum system lines, dental water lines, and plaster traps dental chairs, x-ray machines, and view boxes.

Woodbridge High School, Irvine Unified School District, and PA 40 Middle School, Irvine Unified School District. Projects gym upgrades: new gym floor from sleepers, sub floor, and maple strip floor. Modernization including underground utilities: trench/backfill, gas, telecommunication, power, sewer, and storm drain lines. Boiler, cooling tower, and heat pumps. Fire alarm system including; strobe/horn, pull downs, heat/smoke detectors, dampers, beam and beam reflectors, and riser/bell. Other upgrades included: HVAC, Tbars ceiling, insulation, sheer walls, patch concrete work, decking, lath/plaster, wood framing, cabinets, lockers installation and painting.